Product Description
The advantages of the CPD30 forklift include:
1. Strong carrying capacity: The CPD30 forklift has a high carrying capacity and can meet the handling needs in most industrial and warehousing scenarios.
2. Flexible operability: The CPD30 forklift adopts electric drive, which is easy and convenient to operate, can achieve precise handling and stacking operations, and improve work efficiency.
3. Environmental protection and energy saving: The CPD30 forklift adopts electric drive, does not produce exhaust gas and noise, and does not pollute the environment. In addition, its battery can be recharged repeatedly, which is energy-saving and environmentally friendly.
4. Strong safety performance: The CPD30 forklift is equipped with a number of safety protection devices, such as lifting limit devices and anti-tilt devices to ensure the safety of operators and goods.
5. Low maintenance cost: The CPD30 forklift is manufactured with advanced technology and high-quality materials, has good durability and reliability, and has low maintenance costs.
6. Multiple configuration options: The CPD30 forklift has a variety of configurations. While meeting the needs of different users, it can also be customized according to actual conditions.
7. Good ergonomic design: The operating console of the CPD30 forklift is scientifically and reasonably designed, with a friendly human-machine interface, making the operator more comfortable and convenient at work. In summary, the CPD30 truck has the advantages of strong carrying capacity, flexible operability, environmental protection and energy saving, strong safety performance, and low maintenance cost. It is suitable for the handling needs of various industrial and warehousing scenarios.
Product Parameters
Company Profile
Certifications
Packaging & Shipping
FAQ
1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted
2: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC,
3: What about the delivery time?
A: 30 days after receiving the deposit.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occuts first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs.