Customization: | Available |
---|---|
After-sales Service: | 1year |
Warranty: | 1year |
Still deciding? Get samples of US$ 68000/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
XE215C have excelent fuel economyenabling fuel consumption decline by 10%, which greatly reduces operating costs. New high-eficiency main pump is fuupgraded, with large displacement,which is 7% higher than that of the previous generation. A new generation instrument has an 8-inch large screendisplay ,which can achieve faster data management and more efficient control.
Item | Unit | Parameter |
Operating weight | Kg | 21500 |
Bucket capacity | m3 | 0.8~1.0 |
Engine Model | ISUZU | |
Rated power/speed | kw/rpm | 106.5/1950 |
Maximum torque/speed | N.m | 551/1600 |
Travel speed (H/L) | km/h | 5.5/3.3 |
Swing speed | r/min | 13.3 |
Displacement | L | 6.494 |
Bucket digging force | kN | 138 |
Arm digging force | kN | 103 |
Max. gradeability | ≥35 | |
Rate flow of main pump | L/min | 2×206 |
Max pressure of prime relief valve | MPa | 31.5/34.4 |
Max pressure of travel system | MPa | 34.3 |
Max pressure of swing system | MPa | 28 |
Max pressure of pilot system | MPa | 3.9 |
Leading product coverage: 11 categories/56 product series/nearly 600 varieties